Engineering Documentation have provided BIM support to both the Mechanical and Electrical contractors involved in the construction Blocks D, E and the Village Centre as part of Phase 1 of the UCD Village Residences project.
Our works included verification of design model including pipe sizes, fittings etc. and full spatial coordination between services. Plantrooms were modelled from scratch from the design schematics and laid out to suit the installation. Builderswork opes were included and scheduled to facilitated the main contractor’s team.
Once co-ordinated, a full drawing pack was issued to the construction team to install.
This was checked by point cloud scan to give field verification that the installation and model corresponded.