Project Cadenza is a new flagship office development for Irish Life carried out to BIM Level 2.  Our scope involved representing the Electrical contractor to ensure they met all their BIM requirements in the delivery of this project.

As well as the general day to day co-ordination of the electrical services, our BIM team also ensured our client was able to comply with the COBie (Construction Operations Building Information Exchange) requirements of this project.  To deliver this involved ensuring that all generic equipment from design stage was replaced with the actual families of the products used on site.  Where these were unavailable, our team created bespoke families from project data sheets to ensure correct representation within the model.

Our team then addressed the asset requirements for handover, specifically ensuring that the asset data for the products used was included in the correct format and could be published in COBie format.  This ensured that the model met both the graphical and non-graphical requirement for project handover.

Share on facebook
Share on twitter
Share on linkedin
Share on email
Edmund Rice College
Carpenterstown
UCD Village Residences
Phase 1
Please leave your details and we'll get back to you as soon as possible.