• Specialists in BIM (Building Information Modelling)
  • +353 71 9141564

National Gallery of Ireland

About Project:

As part of the renovations and restorations carried out on the National Gallery of Ireland in 2017, we compiled the Electrical O&M Manuals and 'as installed' drawings on behalf of Brian Healy Electrical.  The construction project included the refurbishment of Historic Dargan and Milltown Wings and infill of the central Sculpture Court as well as new basement Energy Centre and new basement level server and security rooms.

ENGdoc worked on behalf of the electrical contractor to ensure all drawings and CAD work was carried out in a detailed and accurate manner to ensure the 'as built' drawings were completed to a very high standard.  All individual circuit references, device numbers and reference tags were included on the drawings.

Site attendance to redline the drawings, walk-down systems and compile technical narratives were all included as part of our service package to deliver handover documentation.

Client:

Brian Healy Electrical
Share this: