• Specialists in BIM (Building Information Modelling)
  • +353 71 9141564

Advanced Technology Unit, Tralee

About Project:

As part of a major €250 million stimulus plan to boost employment in the regions, this project was one of the first to deliver a purpose designed advanced manufacturing facility at Kerry Technology Park.  The building is suitable for pharmaceutical or medical technology or high value engineering.

The development consisted of a gross floor area of 2540m/sq and includes office facilities, carparking, signage, and all associated site works including vehicular access to serve the entire facility.

The building is predominantly steel portal, with pre-cast flooring, heavy duty in-situ floor slab, clad in Kingspan Optimo and Louvre sheeting laid vertically.

Heating is by means of air-water and fan coil units distributed throughout. Internally a generous double height foyer leads to associated office space where raised access computer flooring will provide long term flexibility for client requirements.

Engineering Documentation Ltd. delivered the handover documentation for the project including Digital Safety File, Mechanical O&M Manual and 'As Installed' Drawings.



Eamon Costello (Kerry) Ltd.
Share this: